City of Dekalb Airport Advisory Board met Nov. 24.
Here is the agenda provided by the board:
A. CALL TO ORDER AND ROLL CALL
B. APPROVAL OF THE AGENDA
C. APPROVAL OF THE MINUTES
1. Minutes of the Airport Advisory Board Meeting of October 28, 2025.
D. PUBLIC PARTICIPATION
E. OLD BUSINESS
1. Perimeter Fence Project Update
a. Project is complete
b. Final Inspection was performed; punch list was created.
c. Payment will not happen until punch list is completed.
F. NEW BUSINESS
1. McClure Engineering Presentation
2. DKB 2027 TIPS Program Overview
a. Taxiway B rehabilitation (2027)
i. Currently in Design Phase
ii. 35% Design submitted on 11/21/25
iii. Based on aircraft use, the airport is eligible for 35-foot-wide taxiway.Â
The current taxiway is 50 feet wide. Airport staff are working with FAA to justify and approve the full 50-foot-wide rehabilitation.
b. Taxiway A rehabilitation (2027)
c. Replace Perimeter Fence Phase 2 (2028)
d. Rehabilitate Taxiway B Aprons (2028)
e. Rehabilitate Runway 2/20 Lighting and update Airfield Guidance Signs (2029)
f. Replace Perimeter Fence Phase 3 (2029)
G. ADJOURNMENT
https://www.cityofdekalb.com/AgendaCenter/ViewFile/Agenda/_11252025-2780



